MISO Queue Project J084 — Wind in Grant, Wisconsin

MISO Queue Project J084 — Wind in Grant, Wisconsin is a 50.0 MW wind interconnection project in Grant, Wisconsin with a current status of withdrawn. It is proposed to connect at Bloomington 69 kV Substation.

50.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J084 — Wind in Grant, Wisconsin
Queue IDJ084
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity50.0 MW
StateWisconsin
CountyGrant
Point of interconnectionBloomington 69 kV Substation
Requested (queue) date2009-10-05
Proposed in-service date2012-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata