MISO Queue Project J093 — Wind in Greene, Iowa

MISO Queue Project J093 — Wind in Greene, Iowa is a 50.0 MW wind interconnection project in Greene, Iowa with a current status of withdrawn. It is proposed to connect at MEC Drager - Grand Junction 161 kV.

50.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J093 — Wind in Greene, Iowa
Queue IDJ093
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity50.0 MW
StateIowa
CountyGreene
Point of interconnectionMEC Drager - Grand Junction 161 kV
Requested (queue) date2009-10-28
Proposed in-service date2010-07-31
Operational date
Withdrawn date2017-01-10
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata