MISO Queue Project J145 — Hydro in Miller, Missouri

MISO Queue Project J145 — Hydro in Miller, Missouri is a 14.0 MW hydro interconnection project in Miller, Missouri with a current status of operational. It is proposed to connect at Osage Power Plant.

14.0 MWCapacity
OperationalStatus
MISOMarket
HydroTechnology

Project facts

Canonical nameMISO Queue Project J145 — Hydro in Miller, Missouri
Queue IDJ145
Statusoperational
Source statusoperational
MarketMISO
TechnologyHydro
Capacity14.0 MW
StateMissouri
CountyMiller
Point of interconnectionOsage Power Plant
Requested (queue) date2010-06-25
Proposed in-service date2004-06-07
Operational date2004-06-07
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata