MISO Queue Project J168 — Wind in Dekalb, Missouri

MISO Queue Project J168 — Wind in Dekalb, Missouri is a 200.0 MW wind interconnection project in Dekalb, Missouri with a current status of withdrawn. It is proposed to connect at Ameren Excelsior Springs Substation.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J168 — Wind in Dekalb, Missouri
Queue IDJ168
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateMissouri
CountyDekalb
Point of interconnectionAmeren Excelsior Springs Substation
Requested (queue) date2010-09-13
Proposed in-service date2010-12-31
Operational date
Withdrawn date2011-04-21
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.