MISO Queue Project J168 — Wind in Dekalb, Missouri
MISO Queue Project J168 — Wind in Dekalb, Missouri is a 200.0 MW wind interconnection project in Dekalb, Missouri with a current status of withdrawn. It is proposed to connect at Ameren Excelsior Springs Substation.
200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology
Project facts
| Canonical name | MISO Queue Project J168 — Wind in Dekalb, Missouri |
|---|---|
| Queue ID | J168 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Missouri |
| County | Dekalb |
| Point of interconnection | Ameren Excelsior Springs Substation |
| Requested (queue) date | 2010-09-13 |
| Proposed in-service date | 2010-12-31 |
| Operational date | — |
| Withdrawn date | 2011-04-21 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata