MISO Queue Project J190 — Wind in Ottawa, Michigan

MISO Queue Project J190 — Wind in Ottawa, Michigan is a 100.0 MW wind interconnection project in Ottawa, Michigan with a current status of withdrawn. It is proposed to connect at Kenowa 345kV Substation.

100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J190 — Wind in Ottawa, Michigan
Queue IDJ190
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity100.0 MW
StateMichigan
CountyOttawa
Point of interconnectionKenowa 345kV Substation
Requested (queue) date2010-12-21
Proposed in-service date2019-07-01
Operational date
Withdrawn date2017-07-21
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata