MISO Queue Project J201 — Wind in Bay, Michigan

MISO Queue Project J201 — Wind in Bay, Michigan is a 20.0 MW wind interconnection project in Bay, Michigan with a current status of operational. It is proposed to connect at METC Manning 138kV Substation.

20.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J201 — Wind in Bay, Michigan
Queue IDJ201
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity20.0 MW
StateMichigan
CountyBay
Point of interconnectionMETC Manning 138kV Substation
Requested (queue) date2011-02-16
Proposed in-service date2013-09-01
Operational date2013-09-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.