MISO Queue Project J207 — Solar in Washtenaw, Michigan
MISO Queue Project J207 — Solar in Washtenaw, Michigan is a 100.0 MW solar interconnection project in Washtenaw, Michigan with a current status of withdrawn. It is proposed to connect at Luzon - Kentucky 120 kV.
100.0 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology
Project facts
| Canonical name | MISO Queue Project J207 — Solar in Washtenaw, Michigan |
|---|---|
| Queue ID | J207 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Solar |
| Capacity | 100.0 MW |
| State | Michigan |
| County | Washtenaw |
| Point of interconnection | Luzon - Kentucky 120 kV |
| Requested (queue) date | 2011-03-01 |
| Proposed in-service date | 2013-03-31 |
| Operational date | — |
| Withdrawn date | 2012-06-27 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata