MISO Queue Project J220 — Solar in Monroe, Michigan

MISO Queue Project J220 — Solar in Monroe, Michigan is a 45.0 MW solar interconnection project in Monroe, Michigan with a current status of withdrawn. It is proposed to connect at Beecher - Whiting 138 kV.

45.0 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J220 — Solar in Monroe, Michigan
Queue IDJ220
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologySolar
Capacity45.0 MW
StateMichigan
CountyMonroe
Point of interconnectionBeecher - Whiting 138 kV
Requested (queue) date2011-06-27
Proposed in-service date2014-12-31
Operational date
Withdrawn date2012-06-27
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata