MISO Queue Project J233 — Gas in Marshall, Iowa

MISO Queue Project J233 — Gas in Marshall, Iowa is a 700.0 MW gas interconnection project in Marshall, Iowa with a current status of operational. It is proposed to connect at ITC Midwest Marshalltown 161 (Sutherland) Substation.

700.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J233 — Gas in Marshall, Iowa
Queue IDJ233
Statusoperational
Source statusoperational
MarketMISO
TechnologyGas
Capacity700.0 MW
StateIowa
CountyMarshall
Point of interconnectionITC Midwest Marshalltown 161 (Sutherland) Substation
Requested (queue) date2011-11-14
Proposed in-service date2018-06-28
Operational date2018-06-28
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata