MISO Queue Project J267 — Wind in Tuscola, Michigan

MISO Queue Project J267 — Wind in Tuscola, Michigan is a 125.0 MW wind interconnection project in Tuscola, Michigan with a current status of withdrawn. It is proposed to connect at Karn - Garfield 138 kV line.

125.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J267 — Wind in Tuscola, Michigan
Queue IDJ267
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity125.0 MW
StateMichigan
CountyTuscola
Point of interconnectionKarn - Garfield 138 kV line
Requested (queue) date2013-01-14
Proposed in-service date2015-04-27
Operational date
Withdrawn date2014-09-09
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata