MISO Queue Project J289 — Wind in Madison, Iowa

MISO Queue Project J289 — Wind in Madison, Iowa is a 20.0 MW wind interconnection project in Madison, Iowa with a current status of operational. It is proposed to connect at 161 kV sybstation on Winterset Junction to Creston 161 kV Line.

20.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J289 — Wind in Madison, Iowa
Queue IDJ289
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity20.0 MW
StateIowa
CountyMadison
Point of interconnection161 kV sybstation on Winterset Junction to Creston 161 kV Line
Requested (queue) date2013-07-11
Proposed in-service date2013-11-01
Operational date2013-11-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata