MISO Queue Project J294 — Gas in Brown, Wisconsin

MISO Queue Project J294 — Gas in Brown, Wisconsin is a 588.0 MW gas interconnection project in Brown, Wisconsin with a current status of withdrawn. It is proposed to connect at Pulliam 138kV substation.

588.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J294 — Gas in Brown, Wisconsin
Queue IDJ294
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity588.0 MW
StateWisconsin
CountyBrown
Point of interconnectionPulliam 138kV substation
Requested (queue) date2013-09-10
Proposed in-service date2020-06-01
Operational date
Withdrawn date2014-09-25
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata