MISO Queue Project J302 — Wind in Emmons, North Dakota

MISO Queue Project J302 — Wind in Emmons, North Dakota is a 101.2 MW wind interconnection project in Emmons, North Dakota with a current status of operational. It is proposed to connect at 230kV Heskett-Wishek.

101.2 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J302 — Wind in Emmons, North Dakota
Queue IDJ302
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity101.2 MW
StateNorth Dakota
CountyEmmons
Point of interconnection230kV Heskett-Wishek
Requested (queue) date2013-11-18
Proposed in-service date2019-11-15
Operational date2019-11-15
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata