MISO Queue Project J316 — Wind in Dickey, North Dakota

MISO Queue Project J316 — Wind in Dickey, North Dakota is a 150.0 MW wind interconnection project in Dickey, North Dakota with a current status of operational. It is proposed to connect at MDU 230 kV Tatanka-Ellendale line.

150.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J316 — Wind in Dickey, North Dakota
Queue IDJ316
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity150.0 MW
StateNorth Dakota
CountyDickey
Point of interconnectionMDU 230 kV Tatanka-Ellendale line
Requested (queue) date2013-11-18
Proposed in-service date2016-10-01
Operational date2016-10-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata