MISO Queue Project J352 — Gas in Dickinson, Michigan

MISO Queue Project J352 — Gas in Dickinson, Michigan is a 362.0 MW gas interconnection project in Dickinson, Michigan with a current status of withdrawn. It is proposed to connect at Unknown.

362.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J352 — Gas in Dickinson, Michigan
Queue IDJ352
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity362.0 MW
StateMichigan
CountyDickinson
Point of interconnectionUnknown
Requested (queue) date2014-05-19
Proposed in-service date
Operational date
Withdrawn date2016-01-06
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata