MISO Queue Project J355 — Gas in Adair, Iowa
MISO Queue Project J355 — Gas in Adair, Iowa is a 810.0 MW gas interconnection project in Adair, Iowa with a current status of withdrawn. It is proposed to connect at Cooper-Atchison Co-Booneville 345 kV crosses Pony Creek-Rolling Hills 345 kV.
810.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology
Project facts
| Canonical name | MISO Queue Project J355 — Gas in Adair, Iowa |
|---|---|
| Queue ID | J355 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Gas |
| Capacity | 810.0 MW |
| State | Iowa |
| County | Adair |
| Point of interconnection | Cooper-Atchison Co-Booneville 345 kV crosses Pony Creek-Rolling Hills 345 kV |
| Requested (queue) date | 2014-05-19 |
| Proposed in-service date | 2017-08-01 |
| Operational date | — |
| Withdrawn date | 2014-07-07 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.