MISO Queue Project J364 — Gas in Adair, Iowa is a 464.0 MW gas interconnection project in Adair, Iowa with a current status of withdrawn. It is proposed to connect at Cooper-Atchison Co-Booneville 345 kV crosses CBPS Pony Creek-Rolling Hills-Madison Co 345 kV line.
Project facts
| Canonical name | MISO Queue Project J364 — Gas in Adair, Iowa |
|---|---|
| Queue ID | J364 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Gas |
| Capacity | 464.0 MW |
| State | Iowa |
| County | Adair |
| Point of interconnection | Cooper-Atchison Co-Booneville 345 kV crosses CBPS Pony Creek-Rolling Hills-Madison Co 345 kV line |
| Requested (queue) date | 2014-05-19 |
| Proposed in-service date | 2016-01-10 |
| Operational date | — |
| Withdrawn date | 2014-07-07 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.