MISO Queue Project J404 — Gas in Jefferson Parish, Louisiana
MISO Queue Project J404 — Gas in Jefferson Parish, Louisiana is a 1,078.0 MW gas interconnection project in Jefferson Parish, Louisiana with a current status of withdrawn. It is proposed to connect at One miles south of EES Nine Mile Point substation in Bridge City.
Project facts
| Canonical name | MISO Queue Project J404 — Gas in Jefferson Parish, Louisiana |
|---|---|
| Queue ID | J404 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | MISO |
| Technology | Gas |
| Capacity | 1,078.0 MW |
| State | Louisiana |
| County | Jefferson Parish |
| Point of interconnection | One miles south of EES Nine Mile Point substation in Bridge City |
| Requested (queue) date | 2014-11-12 |
| Proposed in-service date | 2020-05-01 |
| Operational date | — |
| Withdrawn date | 2016-03-18 |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.