MISO Queue Project J417 — Other in Calcasieu Parish, Louisiana

MISO Queue Project J417 — Other in Calcasieu Parish, Louisiana is a 43.0 MW other interconnection project in Calcasieu Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Entergy 230 kV Graywood substation Big Lake Road.

43.0 MWCapacity
WithdrawnStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameMISO Queue Project J417 — Other in Calcasieu Parish, Louisiana
Queue IDJ417
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyOther
Capacity43.0 MW
StateLouisiana
CountyCalcasieu Parish
Point of interconnectionEntergy 230 kV Graywood substation Big Lake Road
Requested (queue) date2014-11-17
Proposed in-service date
Operational date
Withdrawn date2015-11-13
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata