MISO Queue Project J427 — Gas in Livingston, Michigan

MISO Queue Project J427 — Gas in Livingston, Michigan is a 110.0 MW gas interconnection project in Livingston, Michigan with a current status of withdrawn. It is proposed to connect at 155 Town Line Road, Gaylord, MI.

110.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J427 — Gas in Livingston, Michigan
Queue IDJ427
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity110.0 MW
StateMichigan
CountyLivingston
Point of interconnection155 Town Line Road, Gaylord, MI
Requested (queue) date2014-11-17
Proposed in-service date
Operational date
Withdrawn date2015-01-23
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.