MISO Queue Project J438 — Wind in Poweshiek, Iowa

MISO Queue Project J438 — Wind in Poweshiek, Iowa is a 170.0 MW wind interconnection project in Poweshiek, Iowa with a current status of operational. It is proposed to connect at Poweshiek-Parnell 161 kV line.

170.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J438 — Wind in Poweshiek, Iowa
Queue IDJ438
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity170.0 MW
StateIowa
CountyPoweshiek
Point of interconnectionPoweshiek-Parnell 161 kV line
Requested (queue) date2015-03-16
Proposed in-service date2018-12-15
Operational date2018-12-15
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.