MISO Queue Project J440 — Gas in Wayne, Michigan

MISO Queue Project J440 — Gas in Wayne, Michigan is a 52.0 MW gas interconnection project in Wayne, Michigan with a current status of operational. It is proposed to connect at Consumers DIGG 230 kV substation.

52.0 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J440 — Gas in Wayne, Michigan
Queue IDJ440
Statusoperational
Source statusoperational
MarketMISO
TechnologyGas
Capacity52.0 MW
StateMichigan
CountyWayne
Point of interconnectionConsumers DIGG 230 kV substation
Requested (queue) date2015-03-16
Proposed in-service date2016-01-10
Operational date2016-01-10
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata