MISO Queue Project J450 — Wind in Huron, Michigan

MISO Queue Project J450 — Wind in Huron, Michigan is a 200.0 MW wind interconnection project in Huron, Michigan with a current status of withdrawn. It is proposed to connect at ITC Rapson-Banner 345 kV line.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J450 — Wind in Huron, Michigan
Queue IDJ450
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateMichigan
CountyHuron
Point of interconnectionITC Rapson-Banner 345 kV line
Requested (queue) date2015-05-15
Proposed in-service date2016-02-01
Operational date
Withdrawn date2017-07-21
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata