MISO Queue Project J476 — Wind in Atchison, Missouri is a 246.0 MW wind interconnection project in Atchison, Missouri with a current status of active. It is proposed to connect at Atchison County to Booneville 345 kV Line Tap.

246.0 MWCapacity
ActiveStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J476 — Wind in Atchison, Missouri
Queue IDJ476
Statusactive
Source statusactive
MarketMISO
TechnologyWind
Capacity246.0 MW
StateMissouri
CountyAtchison
Point of interconnectionAtchison County to Booneville 345 kV Line Tap
Requested (queue) date2015-09-14
Proposed in-service date2021-09-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata