MISO Queue Project J500 — Wind in Adair, Iowa
MISO Queue Project J500 — Wind in Adair, Iowa is a 500.0 MW wind interconnection project in Adair, Iowa with a current status of operational. It is proposed to connect at New substation at intersection of MEC 345 kV Boone-Atchison and MEC 345 kV Rolling Hills-Madison County substation.
Project facts
| Canonical name | MISO Queue Project J500 — Wind in Adair, Iowa |
|---|---|
| Queue ID | J500 |
| Status | operational |
| Source status | operational |
| Market | MISO |
| Technology | Wind |
| Capacity | 500.0 MW |
| State | Iowa |
| County | Adair |
| Point of interconnection | New substation at intersection of MEC 345 kV Boone-Atchison and MEC 345 kV Rolling Hills-Madison County substation |
| Requested (queue) date | 2015-11-13 |
| Proposed in-service date | 2017-09-30 |
| Operational date | 2017-09-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MISO |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata