MISO Queue Project J505 — Solar in Manitowoc, Wisconsin

MISO Queue Project J505 — Solar in Manitowoc, Wisconsin is a 99.0 MW solar interconnection project in Manitowoc, Wisconsin with a current status of operational. It is proposed to connect at Apollo 138kV Substation Mishicot-Kewaunee line.

99.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J505 — Solar in Manitowoc, Wisconsin
Queue IDJ505
Statusoperational
Source statusoperational
MarketMISO
TechnologySolar
Capacity99.0 MW
StateWisconsin
CountyManitowoc
Point of interconnectionApollo 138kV Substation Mishicot-Kewaunee line
Requested (queue) date2015-11-13
Proposed in-service date2021-01-28
Operational date2021-01-28
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.