MISO Queue Project J506 — Wind in Plymouth, Iowa

MISO Queue Project J506 — Wind in Plymouth, Iowa is a 200.0 MW wind interconnection project in Plymouth, Iowa with a current status of operational. It is proposed to connect at Raun-Lakefield Jct 345 kV line tap (T-19N, R-43W).

200.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J506 — Wind in Plymouth, Iowa
Queue IDJ506
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity200.0 MW
StateIowa
CountyPlymouth
Point of interconnectionRaun-Lakefield Jct 345 kV line tap (T-19N, R-43W)
Requested (queue) date2015-11-13
Proposed in-service date2019-09-16
Operational date2019-09-16
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata