MISO Queue Project J509 — Gas in Dickey, North Dakota

MISO Queue Project J509 — Gas in Dickey, North Dakota is a 326.9 MW gas interconnection project in Dickey, North Dakota with a current status of withdrawn. It is proposed to connect at Ellendale Township 129N, Range 63W.

326.9 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J509 — Gas in Dickey, North Dakota
Queue IDJ509
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity326.9 MW
StateNorth Dakota
CountyDickey
Point of interconnectionEllendale Township 129N, Range 63W
Requested (queue) date2015-11-16
Proposed in-service date
Operational date
Withdrawn date2015-12-30
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.