MISO Queue Project J519 — Wind in Audubon, Iowa is a 200.0 MW wind interconnection project in Audubon, Iowa with a current status of withdrawn. It is proposed to connect at MEC Atlantic substation, 161 kV bus.

200.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J519 — Wind in Audubon, Iowa
Queue IDJ519
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity200.0 MW
StateIowa
CountyAudubon
Point of interconnectionMEC Atlantic substation, 161 kV bus
Requested (queue) date2015-11-16
Proposed in-service date2017-09-30
Operational date
Withdrawn date2017-07-21
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.