MISO Queue Project J559 — Solar in Washington Parish, Louisiana

MISO Queue Project J559 — Solar in Washington Parish, Louisiana is a 50.0 MW solar interconnection project in Washington Parish, Louisiana with a current status of withdrawn. It is proposed to connect at EEL Holton - Franklinton 115kV.

50.0 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J559 — Solar in Washington Parish, Louisiana
Queue IDJ559
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologySolar
Capacity50.0 MW
StateLouisiana
CountyWashington Parish
Point of interconnectionEEL Holton - Franklinton 115kV
Requested (queue) date2016-04-26
Proposed in-service date2017-10-10
Operational date
Withdrawn date2017-05-16
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.