MISO Queue Project J572 — Gas in Manistee, Michigan

MISO Queue Project J572 — Gas in Manistee, Michigan is a 150.0 MW gas interconnection project in Manistee, Michigan with a current status of withdrawn. It is proposed to connect at Filler City JCT 138kV.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
GasTechnology

Project facts

Canonical nameMISO Queue Project J572 — Gas in Manistee, Michigan
Queue IDJ572
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyGas
Capacity150.0 MW
StateMichigan
CountyManistee
Point of interconnectionFiller City JCT 138kV
Requested (queue) date2016-05-09
Proposed in-service date2019-06-01
Operational date
Withdrawn date2018-10-05
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata