MISO Queue Project J581 — Solar in Morehouse Parish, Louisiana

MISO Queue Project J581 — Solar in Morehouse Parish, Louisiana is a 70.0 MW solar interconnection project in Morehouse Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Bastrop - Sterlington 115kV Line.

70.0 MWCapacity
WithdrawnStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMISO Queue Project J581 — Solar in Morehouse Parish, Louisiana
Queue IDJ581
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologySolar
Capacity70.0 MW
StateLouisiana
CountyMorehouse Parish
Point of interconnectionBastrop - Sterlington 115kV Line
Requested (queue) date2016-05-09
Proposed in-service date2020-10-05
Operational date
Withdrawn date2021-05-27
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata