MISO Queue Project J598 — Wind in Adair, Missouri

MISO Queue Project J598 — Wind in Adair, Missouri is a 300.0 MW wind interconnection project in Adair, Missouri with a current status of withdrawn. It is proposed to connect at Zachary to Ottumwa 345kV tap.

300.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J598 — Wind in Adair, Missouri
Queue IDJ598
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity300.0 MW
StateMissouri
CountyAdair
Point of interconnectionZachary to Ottumwa 345kV tap
Requested (queue) date2016-05-09
Proposed in-service date2021-10-01
Operational date
Withdrawn date2020-01-16
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.