MISO Queue Project J608 — Wind in Montcalm, Michigan

MISO Queue Project J608 — Wind in Montcalm, Michigan is a 100.0 MW wind interconnection project in Montcalm, Michigan with a current status of withdrawn. It is proposed to connect at Deja 138kV Substation.

100.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J608 — Wind in Montcalm, Michigan
Queue IDJ608
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity100.0 MW
StateMichigan
CountyMontcalm
Point of interconnectionDeja 138kV Substation
Requested (queue) date2016-05-09
Proposed in-service date2018-09-01
Operational date
Withdrawn date2018-01-16
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.