MISO Queue Project J611 — Wind in Nodaway, Missouri

MISO Queue Project J611 — Wind in Nodaway, Missouri is a 110.0 MW wind interconnection project in Nodaway, Missouri with a current status of operational. It is proposed to connect at Clarinda - Merryville 161kV tap.

110.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J611 — Wind in Nodaway, Missouri
Queue IDJ611
Statusoperational
Source statusoperational
MarketMISO
TechnologyWind
Capacity110.0 MW
StateMissouri
CountyNodaway
Point of interconnectionClarinda - Merryville 161kV tap
Requested (queue) date2016-05-09
Proposed in-service date2020-10-01
Operational date2020-10-01
Withdrawn date
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata