MISO Queue Project J649 — Nuclear in Dauphin, Pennsylvania

MISO Queue Project J649 — Nuclear in Dauphin, Pennsylvania is a 829.0 MW nuclear interconnection project in Dauphin, Pennsylvania with a current status of withdrawn. It is proposed to connect at Exisiting interconnection in TMI Switchyard at 220kV.

829.0 MWCapacity
WithdrawnStatus
MISOMarket
NuclearTechnology

Project facts

Canonical nameMISO Queue Project J649 — Nuclear in Dauphin, Pennsylvania
Queue IDJ649
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyNuclear
Capacity829.0 MW
StatePennsylvania
CountyDauphin
Point of interconnectionExisiting interconnection in TMI Switchyard at 220kV
Requested (queue) date2016-06-24
Proposed in-service date2057-09-01
Operational date
Withdrawn date2017-01-31
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata