MISO Queue Project J738 — Wind in Green, Wisconsin

MISO Queue Project J738 — Wind in Green, Wisconsin is a 150.0 MW wind interconnection project in Green, Wisconsin with a current status of withdrawn. It is proposed to connect at Unknown.

150.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project J738 — Wind in Green, Wisconsin
Queue IDJ738
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity150.0 MW
StateWisconsin
CountyGreen
Point of interconnectionUnknown
Requested (queue) date2016-11-11
Proposed in-service date2020-09-15
Operational date
Withdrawn date2017-07-21
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata