MISO Queue Project PQ0002 — Other in Cerro Gordo, Iowa

MISO Queue Project PQ0002 — Other in Cerro Gordo, Iowa is a 2,000.0 MW other interconnection project in Cerro Gordo, Iowa with a current status of withdrawn. It is proposed to connect at Killdeer 345 kV Substation.

2,000.0 MWCapacity
WithdrawnStatus
MISOMarket
OtherTechnology

Project facts

Canonical nameMISO Queue Project PQ0002 — Other in Cerro Gordo, Iowa
Queue IDPQ0002
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyOther
Capacity2,000.0 MW
StateIowa
CountyCerro Gordo
Point of interconnectionKilldeer 345 kV Substation
Requested (queue) date2015-08-11
Proposed in-service date2021-12-31
Operational date
Withdrawn date2018-12-11
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata