MISO Queue Project R58 — Wind in Pottawattamie, Iowa

MISO Queue Project R58 — Wind in Pottawattamie, Iowa is a 3.0 MW wind interconnection project in Pottawattamie, Iowa with a current status of withdrawn. It is proposed to connect at MEC Teakwood (Walnut) 161kV Substation.

3.0 MWCapacity
WithdrawnStatus
MISOMarket
WindTechnology

Project facts

Canonical nameMISO Queue Project R58 — Wind in Pottawattamie, Iowa
Queue IDR58
Statuswithdrawn
Source statuswithdrawn
MarketMISO
TechnologyWind
Capacity3.0 MW
StateIowa
CountyPottawattamie
Point of interconnectionMEC Teakwood (Walnut) 161kV Substation
Requested (queue) date2009-04-08
Proposed in-service date2008-12-31
Operational date
Withdrawn date2017-01-10
Developer
Utility / transmission ownerMISO

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata