Misty Hollow BESS (26INR0324)

Misty Hollow BESS is a 245.8 MW other interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at 345 kV Singleton (#44645).

245.8 MWCapacity
OperationalStatus
GrimesMarket
OtherTechnology

Project facts

Canonical nameMisty Hollow BESS
Queue ID26INR0324
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketGrimes
TechnologyOther
Capacity245.8 MW
StateTexas
CountyGrimes
Point of interconnection345 kV Singleton (#44645)
Requested (queue) date2023-12-20
Proposed in-service date
Operational date2028-07-15
Withdrawn date
DeveloperClear Fork
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata