Mobee Springs BESS (28INR0175)

Mobee Springs BESS is a 100.6 MW other interconnection project in Refugio, Texas with a current status of operational. It is proposed to connect at #8805 BONIVIEW2A 69kV .

100.6 MWCapacity
OperationalStatus
RefugioMarket
OtherTechnology

Project facts

Canonical nameMobee Springs BESS
Queue ID28INR0175
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketRefugio
TechnologyOther
Capacity100.6 MW
StateTexas
CountyRefugio
Point of interconnection#8805 BONIVIEW2A 69kV
Requested (queue) date2025-06-05
Proposed in-service date
Operational date2028-03-31
Withdrawn date
DeveloperMobee Springs, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata