Moffitt Solar (0653)

Moffitt Solar is a 20.0 MW solar interconnection project in Clinton, New York with a current status of withdrawn. It is proposed to connect at Northend - Woodruff Pond 46kV.

20.0 MWCapacity
WithdrawnStatus
DMarket
SolarTechnology

Project facts

Canonical nameMoffitt Solar
Queue ID0653
Statuswithdrawn
Source status0
MarketD
TechnologySolar
Capacity20.0 MW
StateNew York
CountyClinton
Point of interconnectionNorthend - Woodruff Pond 46kV
Requested (queue) date2017-08-07
Proposed in-service date2018-09-30
Operational date
Withdrawn date
DeveloperPlattsburgh Solar, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata