Monett 161 kV Substation (GEN-2023-234)

Monett 161 kV Substation is a 74.9 MW battery interconnection project in Barry, Missouri with a current status of withdrawn. It is proposed to connect at Monett 161 kV Substation.

74.9 MWCapacity
WithdrawnStatus
MOMarket
BatteryTechnology

Project facts

Canonical nameMonett 161 kV Substation
Queue IDGEN-2023-234
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyBattery
Capacity74.9 MW
StateMissouri
CountyBarry
Point of interconnectionMonett 161 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2025-11-15
Operational date
Withdrawn date2023-11-27
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.