Monte Alto 2 Wind (19INR0023)

Monte Alto 2 Wind is a 199.2 MW other interconnection project in Willacy, Texas with a current status of operational. It is proposed to connect at tap 345kV 8318 Rio Hondo - 8383 N Edinburg.

199.2 MWCapacity
OperationalStatus
WillacyMarket
OtherTechnology

Project facts

Canonical nameMonte Alto 2 Wind
Queue ID19INR0023
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketWillacy
TechnologyOther
Capacity199.2 MW
StateTexas
CountyWillacy
Point of interconnectiontap 345kV 8318 Rio Hondo - 8383 N Edinburg
Requested (queue) date2016-11-04
Proposed in-service date
Operational date2028-12-31
Withdrawn date
DeveloperMonte Alto Windpower, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata