Monte Vista 138 kV Substation (ERAS-2025-022)

Monte Vista 138 kV Substation is a 123.0 MW battery interconnection project in Ada, Oklahoma with a current status of operational. It is proposed to connect at Monte Vista 138 kV Substation.

123.0 MWCapacity
OperationalStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameMonte Vista 138 kV Substation
Queue IDERAS-2025-022
Statusoperational
Source statusERAS
MarketOK
TechnologyBattery
Capacity123.0 MW
StateOklahoma
CountyAda
Point of interconnectionMonte Vista 138 kV Substation
Requested (queue) date2025-10-01
Proposed in-service date
Operational date2028-01-15
Withdrawn date
Developer
Utility / transmission ownerPEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata