Montgomery Ranch 2 Wind is a 301.5 MW other interconnection project in Foard, Texas with a current status of active. It is proposed to connect at 60059 Penumbra 345-kV.

301.5 MWCapacity
ActiveStatus
FoardMarket
OtherTechnology

Project facts

Canonical nameMontgomery Ranch 2 Wind
Queue ID29INR0326
Statusactive
Source statusSS Started, FIS Started, No IA
MarketFoard
TechnologyOther
Capacity301.5 MW
StateTexas
CountyFoard
Point of interconnection60059 Penumbra 345-kV
Requested (queue) date2026-05-11
Proposed in-service date2029-12-31
Operational date
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata