Montgomery Winsted CSG (61456_41621)

Montgomery Winsted CSG is a 1.0 MW solar interconnection project in McLeod, Minnesota with a current status of operational.

1.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameMontgomery Winsted CSG
Queue ID61456_41621
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity1.0 MW
StateMinnesota
CountyMcLeod
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2017-11-01
Withdrawn date
Developer
Utility / transmission ownerMinnesota Solar CSG 19, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata