Montrose 115 Sub is a 50.0 MW battery interconnection project in Montrose County, Colorado with a current status of operational. It is proposed to connect at Montrose 115 Sub.

50.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology

Project facts

Canonical nameMontrose 115 Sub
Queue IDGI-RSC-2025-03
Statusoperational
Source statusNone
MarketCO
TechnologyBattery
Capacity50.0 MW
StateColorado
CountyMontrose County
Point of interconnectionMontrose 115 Sub
Requested (queue) date2025-07-18
Proposed in-service date
Operational date2027-11-30
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.