Montrose 115 Sub (GI-RSC-2025-03)

Montrose 115 Sub is a 50.0 MW battery interconnection project in Montrose County, Colorado with a current status of active. It is proposed to connect at Montrose 115 Sub.

50.0 MWCapacity
ActiveStatus
COMarket
BatteryTechnology

Project facts

Canonical nameMontrose 115 Sub
Queue IDGI-RSC-2025-03
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketCO
TechnologyBattery
Capacity50.0 MW
StateColorado
CountyMontrose County
Point of interconnectionMontrose 115 Sub
Requested (queue) date2025-07-18
Proposed in-service date2027-11-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-01operational_date2027-11-30—medium
2026-09-01proposed_online_date—2027-11-30medium
2026-09-01statusoperationalactivehigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata