Montrose 115 Substation (GI-TC-2024-19)

Montrose 115 Substation is a 100.0 MW battery interconnection project in Montrose County, Colorado with a current status of active. It is proposed to connect at Montrose 115 Substation.

100.0 MWCapacity
ActiveStatus
COMarket
BatteryTechnology

Project facts

Canonical nameMontrose 115 Substation
Queue IDGI-TC-2024-19
Statusactive
Source statusIA FULLY EXECUTED/ON SUSPENSION
MarketCO
TechnologyBattery
Capacity100.0 MW
StateColorado
CountyMontrose County
Point of interconnectionMontrose 115 Substation
Requested (queue) date2024-05-07
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata