Moonlight Flats Solar (C24-301)
Moonlight Flats Solar is a 250.0 MW solar interconnection project in Clearfield, Pennsylvania with a current status of active. It is proposed to connect at Homer City 345 kV to Mainesburg 345 kV L47.
250.0 MWCapacity
ActiveStatus
CMarket
SolarTechnology
Project facts
| Canonical name | Moonlight Flats Solar |
|---|---|
| Queue ID | C24-301 |
| Status | active |
| Source status | 6 |
| Market | C |
| Technology | Solar |
| Capacity | 250.0 MW |
| State | Pennsylvania |
| County | Clearfield |
| Point of interconnection | Homer City 345 kV to Mainesburg 345 kV L47 |
| Requested (queue) date | 2024-09-30 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Moonlight Flats Solar Power, LLC |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata